Skip to content
Flowboard

Closed BetaPowered by Official Kanban Guide

Kanban that actually flows. Designed from your real data.

Stop managing static tickets. The 9-step STATIK wizard turns messy workflows into calibrated WIP limits, deterministic lead-time distributions, and predictable delivery from day one.

Instant browser prototype. Zero sign-up required. Privacy-first.

Payments & ordersBoardInteractive Demo
Filter:
Click any card to inspect
Expedite0/1
Commitment zone

In development

3 in progress, limit 3

Reviewer assigned

  • Card payment retry logic

    Standard3d
  • Verify PSP webhook signatures

    Standard5d

    BlockedWaiting for PSP test key

  • Stop stacked coupons

    Standard1d

In QA

1 in progress, limit 2

On the test server

  • Speed up order history page

    Standard14dOver SLE
FLOW-127Verify PSP webhook signatures
Age5d
85% SLE Target12d
AssigneeM
StatusBlocked
Block Reason: Waiting for PSP test key

How to read the board

  • Cards in column / WIP limit
  • Commitment point: lead time starts here
  • Blocked: shown with the reason
  • Over SLE: open longer than 85% of past work

A typical Kanban board does not show flow. It hides bottlenecks.

Why teams burn out and abandon Kanban within their first month:

Bottleneck Flow SimulatorStress Test
Backlog4 items
Item #101
Item #102
Item #103
In Progress3/3 (WIP Calibrated)
Task #401 (In dev)3d
Task #405 (Pull rule verified)5d
Delivered6 items / week
Task #398 (Released)

WIP limits regulate incoming flow, delivering work steadily at a predictable pace (85% within 12 days).

  1. 01
    Common Trap

    Defaulting to arbitrary columns

    To Do, Doing, Done does not show where work waits, when commitment begins, or why handoffs fail.

  2. 02
    Common Trap

    WIP limits pulled from thin air

    Unfounded limits cause immediate friction. When limits break constantly, teams delete them entirely.

  3. 03
    Common Trap

    The blind 'When will it be done?' trap

    Without historical lead times, every delivery date is a blind guess. With real distribution data, you answer with certainty: '85% within 12 days'.

STATIK: Systems Thinking Approach to Introducing Kanban

Design a tailored Kanban system from how your team actually works today. 9 structured steps. 30 to 60 minutes for an engineering leader to produce a production-ready draft.

DesignStep 5 / 9
Step 5 · Design

Workflow

Map actual work phases into columns and establish the commitment point.

Workflow Columns & Commitment
Key Output Configured by Wizard

Triage -> [Commitment Point] -> In Dev -> Code Review -> QA -> Delivered.

Interactive System Blueprint
5/9
1. Service PurposePayments & Orders (99.99%)
2. Demand & Capabilityp85 SLE: 12d · Throughput: 6/wk
3. Workflow ColumnsRequests -> [Commit] -> Dev -> QA -> Done
4. Expedite LanePending...
5. Soft WIP LimitsPending...
6. Cards & Final SocializationPending...

Understand

Steps 1 to 2

Decide who the team serves and what frustrates delivery today.

  1. 01

    Service purpose

    Define in one clear sentence what the service delivers and to whom.

  2. 02

    Sources of dissatisfaction

    Gather complaints inside and outside the team to anchor the reason to improve.

Measure

Steps 3 to 4

Measure incoming demand and baseline delivery speed with data.

  1. 03

    Demand profiling

    Categorize incoming work by type and analyze arrival frequencies.

  2. 04

    Capability analysis

    Measure delivery velocity using historical lead times and throughput data.

Design

Steps 5 to 9

Set columns, classes of service, WIP limits, and cards, then finalize with your team.

  1. 05

    Workflow

    Map actual work phases into columns and establish the commitment point.

  2. 06

    Classes of service

    Define Expedite, Fixed Date, and Standard classes with strict entry policies.

  3. 07

    WIP & team policies

    Calibrate column WIP limits and specify pull criteria as explicit team agreements.

  4. 08

    Card design

    Customize visible metadata fields displayed on the card face.

  5. 09

    Socialize & finalize

    Share interactive draft links with your team, gather feedback, and launch the board.

  • Every step is modular. Skip ahead and resume whenever ready.
  • No historical CSV? Begin with heuristics; metrics will flag SLE targets as hypotheses.
  • Share review links with teammates to collect consensus before opening the board.

Deterministic Metrics. Pure Flow Mechanics.

Zero guesswork. Every metric is computed deterministically from your immutable event log. Same log, identical result, every single time.

Lead Time & The 85% Service Level Expectation (SLE)

Lead time is calendar days from first commitment to delivery. The 85th percentile uses nearest rank without interpolation, guaranteeing that your expectation is rooted in real historical events.

Start Point
First commitment: calendar day a card crosses the commitment point
End Point
Delivery date (Delivered column)
Time Unit
Calendar days, Asia/Seoul timezone
Percentile
Nearest rank, zero interpolation

Lead time distribution

Days across, items upSample data, 30 items

0240510152085% 12d
85% of 30 items finished within 12 days. That becomes the team's service level expectation: “85% within 12 days”.
  • Throughput Tracking

    Measure delivered work items per cadence. Read alongside lead time to verify steady, sustainable delivery flow.

  • WIP Aging Telemetry

    Track active days directly on every card. Instantly flags items running past your 85% SLE expectation.

  • Soft WIP Limits with 1-Tap Telemetry

    Moving past WIP limit never hard-blocks urgent work. A gentle prompt captures the reason in one tap, preserving delivery flow.

  • Strict Single-Item Expedite Lane

    Expedite work gets a dedicated single-slot lane. Strict limit of 1 active item stops priority inflation and protects focus.

  • Explicit Team Policies

    Document pull criteria per column and entry rules per class. Displayed directly on the board for the entire team.

  • Privacy-Preserving AI Copilot

    Requires explicit admin opt-in. Sensitive identifiers, emails, and phone numbers are masked before sending. Full control without AI.

  • CSV Import for Analysis Only

    Upload past ticket CSVs solely to model historical demand and baseline SLE. Never pollutes your board with dummy cards.

  • Granular Blocked Time Accounting

    Block reasons and duration stay in the log, uncovering external dependencies and handoff bottlenecks during retrospectives.

How the Closed Beta Works

We are onboarding 3 to 5 pilot engineering teams. Workspaces are provisioned via private one-time access codes.

  1. 01

    Request Access

    Share your team size, tech stack, and current workflow via email.

    Step 01
  2. 02

    Receive One-Time Passcode

    We issue a dedicated single-use workspace provisioning key.

    Step 02
  3. 03

    Sign In & Provision

    Authenticate with Google or GitHub and unlock your isolated workspace.

    Step 03
  4. 04

    Launch with STATIK Wizard

    Complete the guided design in under an hour and invite your team to the board.

    Step 04
Flowboard Closed Beta

Experience Flow Before Writing a Single Line of Code

Walk through the full STATIK design wizard, interactive board, and flow analytics directly in your browser. Closed beta invitations are open.